Delivery Score · free

Could your next slipped date or open decision cost more than you expect?

Find out how close your programme is to No-Surprises Delivery, before a slipping date turns political.

FREE

About 4 minutes · No documents needed · Results on screen · No sales call unless you ask

15 Yes/No questions on the 5Cs Framework™, plus 5 about your situation. An indicative self-assessment, not an audit of your programme.

What you get
1
Your Delivery ScoreOut of 100, whether your controls appear Fragile, Exposed or Resilient, and your level on The Delivery Control Ladder™.
2
Your potential weak pointsWhich delivery controls may leave your programme exposed, and why it matters.
3
Your first corrective actionsWhere to focus before the drift reaches the board. Part of your free full report.
DELIVERY SCORE · FREE

How much control do you really have?

In about 4 minutes, see what’s working, what to fix first, and the simplest way to fix it: on your own or with help.

Where is your programme right now?

About 4 minutes · No documents needed · Results on screen · No sales call unless you ask

Your resultExample
Delivery Score
0 of 15working
0to fix
How the score works

Know where your programme may be exposed. In four minutes.

An indicative result based on your own answers. It points to where to look first. It is not an audit of your programme.

1Your Delivery ScoreOut of 100, with your band: Fragile, Exposed or Resilient, and your level on The Delivery Control Ladder™.
2Your five-C profileWhere your delivery control looks stronger or weaker, control by control.
3Your weakest controlThe one to look at first, and why it matters.
4Your detailed reportThree first actions and a five-line checklist, with a PDF. Free with your email.
8.5%of major projects land on budget and on schedule.Bent Flyvbjerg, University of Oxford. Study of 16,000+ projects worldwide.
The 5Cs Framework™

What the Delivery Score assesses.

Three Yes/No questions on each control: fifteen in all.

  1. C1CONTAINScope and change boundaries
  2. C2COMMANDOne executable plan
  3. C3CLOSEDecision ownership and closure
  4. C4CONFIRMSupplier commitments and evidence
  5. C5CONTROLWeekly visibility and corrective action

Example profile, illustrative only: 67 · 67 · 33 · 67 · 67.

The Delivery Control Ladder™

Where do you think you stand?

Two things improve as you climb: how early you see problems, and how quickly you act. Your score places you on one of five levels.

The Delivery Control Ladder™Select a level
Discover problems too lateAnticipate and act early
Select the level that sounds most like your project.
Common questions

Answers, straight.

How long does it take?

About 4 minutes: 15 Yes/No questions, then 5 short questions about your situation.

Is it free?

Yes. Your score shows straight away, with no email needed. Your email is only asked for if you want the detailed report.

What do I get?

Your Delivery Score out of 100, your band, your level on The Delivery Control Ladder™, your five C scores and your weakest control. The detailed report adds three first actions and a five-line checklist, with a PDF copy.

What happens after?

Use the report to improve delivery control yourself, or book a free 45-minute call to go through your result. No documents needed, no obligation.

Projects don’t fail. The systems around them do.

Find out where your delivery control stands, before a slipped date or a cost overrun tells you.

FREE

About 4 minutes · Indicative self-assessment · Not an audit of your programme