RESOLVE

Recover control before the work becomes a claim.

By the time it’s visible, it has already cost you. Find the leaks while they’re still recoverable.

Free Delivery Score: 15 Yes/No questions, about 4 minutes, instant result.

Signs you’re here
Scope has changed more than once, and no one has priced the changes yet.✓
You hear about slipped vendor dates after they’ve already slipped.✓
The counterparty has gone quiet: letters, not conversations.✓
Why it matters

By the time it’s a claim, it’s already a loss.

Margin leaks quietly: a scope change never priced, a vendor date that slipped, a decision left open. Each one is recoverable while it’s still a gap. Most are only found once they’ve hardened into a dispute.

Who it’s for

If something is leaking.

Project directors with stalled contracts

Negotiations gone positional. Schedules slipping. Letters while the project bleeds.

Procurement and commercial leaders

You can see margin leaking through agreements that worked once. You can’t yet stop it.

Owners and sponsors who inherited it

Commercial set-ups built by someone else, signed before you arrived.

Read first

Beyond Paperwork Governance

Why controls that look solid on paper collapse on site.

Read the RESOLVE Special Report →
Proof from the field

Same scope. Same contractors. Different control.

A finished fit-out: shared tables, kitchen and work areas

Illustrative: a finished fit-out.

Energy · Belgium · €400M EPC

A stalled FIDIC negotiation, unlocked

Situation
A €400M EPC negotiation stalled. The commercial position had hardened on both sides under mounting time pressure, and the working relationship was eroding. Multiple amendments had made the original commercial mechanism almost unreadable.
Intervention
Brought in to reset the commercial position under pressure. Reframed the dispute away from positions and back toward project value.
Outcome
Stalled negotiation unlocked. The relationship survived the dispute: the harder of the two outcomes.
Before
  • Positions hardened on both sides
  • Mechanism buried under amendments
  • Relationship eroding
After
  • Dispute reframed to project value
  • Negotiation unlocked
  • Relationship preserved
Gas pipeline · Denmark / Poland · €850M+

Six months of idle time, recovered

Situation
Six months of programme time lost to idle time. The schedule was no longer trusted, and the commercial position was exposed.
Intervention
Contract and commercial lead. One defensible plan, decisions closed, vendor dates verified.
Outcome
Recovered within the original programme window. €30M+ claims position maintained.
Before
  • Six months of idle time
  • Schedule no longer trusted
  • Commercial position exposed
After
  • Recovered in the original window
  • €30M+ claims position maintained
The backbone

The 5Cs behind every stage.

The same five controls apply at every stage. What changes is where you start.

  1. C1Contain the ScopeWritten scope, documented assumptions, clear acceptance criteria.
  2. C2Command One PlanOne live baseline that matches the site. Not parallel plans nobody trusts.
  3. C3Close Every DecisionEvery open item gets an owner, a deadline and a consequence.
  4. C4Confirm Vendor DatesCapacity and lead times checked before a date enters the baseline.
  5. C5Control Tower CadenceA fixed weekly rhythm that catches slippage early.
Your next step

Ten days to find it and prove it.

Your product

Delivery Control Reset

Ten business days on one live programme: control gap map, top-ten risk list and a 30/60/90-day recovery plan.

See the Reset →
Contractor?

Ask Contracks

A named senior contract manager on a monthly fee, for contractors and specialist subcontractors.

Visit Ask Contracks
Questions

Answers, straight.

How do I know a Reset is the right step?

If you can feel the programme slipping but can’t yet prove where, it probably is. The review call tells you either way.

We’re the contractor. Is this for us?

No. The Reset is for owner-side teams. Contractors should look at Ask Contracks.

What does it cost?

Fees are fixed and confirmed after the review call, because they depend on programme size and complexity.

What if this isn’t my stage?

Get your free Delivery Score. It takes about four minutes and shows your level on The Delivery Control Ladder™. There’s a full list of stages on the homepage.

Not sure this is your stage?

Let your Delivery Score tell you.

Fifteen Yes/No questions. About four minutes. Your Delivery Score straight away.

  • 1Reactive
  • 2Managed
  • 3Controlled
  • 4Operational
  • 5Scalable
Delivery Score Book a Free 45-Minute Call →