Capital project turnaround

You’ve had the review. Now it has to change.

Six weeks on one live programme. One baseline, explicit decision rights, change blocked at the gate, and a weekly cadence your team runs after we leave. No shutdown.

At a glance
6 weeks✓
Fixed scope and fee✓
Limited availability✓
Owner-side programmes, €10M–€2B✓
Is this you?

You know where it’s drifting. Nothing has changed.

You’ve already had the review. The findings are in a deck.

Every fix needs you in the room. When you step out, it slides back.

The baseline exists on paper. The site runs on a different reality.

The six weeks

An install. Not a report.

Weeks 1–2

Lock the truth

Scope contained, decision rights mapped, one plan everyone runs.

Weeks 3–4

Stop uncontrolled change

Change gate live, impact-first conversations running, first decisions closed end to end.

Weeks 5–6

Make decisions stick

Decision log into execution, one narrative, handover delivered.

Handover

Your team runs it

Templates, standards and a cadence that work without us in the room.

What gets installed

Six outputs. Working parts, not documents.

Who it’s for

The diagnosis is done. Now it has to hold.

Heads of PMO past the review

You need control installed, without becoming the single point of failure that keeps it standing.

Programme and project directors

One live programme that has to be visibly back under control in weeks, not quarters.

Owners and sponsors

A strategically important programme where the next overrun is the one that gets noticed.

Read first

The 5Cs of Refit

For retail brands expanding overseas, run from head office.

Read the RESHAPE Special Report →
Results

A delivery model built to hold.

Construction. Equatorial Guinea.

One-tenth of the expected cost

A community-led worker camp, in 28 months against a 36-month standard. Zero claims. Role: designed the delivery model and managed the contract from day one.

Your next step

Install it. Then hand it over.

Your first step

Delivery Score, then a review call

Free. See where control is slipping, then bring your result to a free 45-minute review call.

Get my Delivery Score — free →
Your product

Programme Turnaround

Six weeks on one live programme: one baseline, decision rights, a change gate and a weekly cadence your team runs after.

Book a Free 45-Minute Call →
Common questions

What the Turnaround is. And what it isn’t.

Won’t this add bureaucracy and slow delivery?

The controls fit around live delivery. The aim is fewer rework cycles, because change is priced before it starts, not after.

Will this die when you leave?

That’s why the handover is a core deliverable. Templates, standards and meeting scripts are built to run without us.

We already do governance. What’s different?

Change doesn’t enter without a ticket. Dates don’t move without an impact conversation. An urgent decision can still be made outside the forum, but it gets recorded and communicated.

Six weeks seems short.

It installs the system on one live programme, not the whole organisation. By week six your team owns the rhythm.

What happens after the six weeks?

Your team runs the system. If you want sustained oversight, the CONTROL Tower retainer keeps the cadence and commercial defence in place. There is no forced retainer.

Which programme would you put back under control?